Work delivered inside the fence line.

Installation, testing and shutdown scopes on plants that were either running or on a fixed outage clock.

RefSelected projects
INST

PetrochemicalJurong Island

Instrument installation and loop checking for a process unit tie-in

Field instrument installation, impulse line and hook-up work, junction box termination and full loop checking through to punch clearance, executed alongside the main mechanical contractor within a fixed tie-in window.

Loops checked
840
Duration
11 wk
Area classification
Zone 1
ELEC

Specialty chemicalsTuas

MCC replacement and cable termination for a production block

Removal of the existing motor control centre, installation and alignment of the replacement lineup, cable pulling and re-termination of motor and control circuits, insulation testing and phased re-energisation across a staged plant outage.

Motor circuits
62
Cable installed
9.4 km
Outage phases
3
QA-QC

PharmaceuticalTuas Biomedical Park

Clean utility instrumentation and calibration package

Installation of sanitary-service instrumentation on clean utility skids, orbital-compatible tubing support, calibration against traceable standards and documentation prepared to suit the client validation protocols.

Instruments
310
Certificates traceable
100%
Documentation set
IQ/OQ
MAINT

Oil storage terminalJurong Island

E&I manpower for a scheduled tank farm turnaround

Shutdown crew supplied against a fixed turnaround schedule covering instrument removal and reinstatement, motor and switchgear maintenance, Ex equipment inspection and post-shutdown loop verification ahead of restart.

Peak crew
28
Shutdown window
18 days
Lost-time injuries
0
INST

Water treatmentWestern Singapore

Instrumentation and control upgrade for a treatment plant

Replacement of legacy field instrumentation with modern transmitters, new cable tray routes and control cabling, marshalling cabinet termination and loop testing to the upgraded control system, carried out while the plant remained in service.

Instruments replaced
215
Plant status
Live
Duration
6 mth
ELEC

Power generationJurong Island

Cable tray, power and control cabling for an auxiliary building

Cable tray and ladder rack support systems, LV power and control cable installation with segregated routing, glanding and termination at distribution boards and local control stations, followed by insulation and continuity testing.

Tray installed
2.1 km
Cable pulled
14 km
Terminations
480
ScopeSectors

The plants we know.

Process industries have their own habits — permit systems, isolation practice, shutdown rhythms, documentation expectations. Familiarity with them is most of what separates a smooth job from an expensive one.

  • Petrochemical and refining
  • Specialty and fine chemicals
  • Oil and gas storage terminals
  • Pharmaceutical and biomedical
  • Power generation and utilities
  • Water and wastewater treatment
  • Food and beverage processing
  • Marine and offshore fabrication
6
Projects shown
5
Sectors represented
Zone 1
Highest area classification
0
Lost-time injuries on shutdown scope

Want the detail behind one of these?

Tell us which sector and scope is closest to your job and we will walk you through how it was executed, what it took, and what we would do differently.