E&I contractorSingaporeEstablished 2000

Instruments installed. Loops proven. Folders signed.

Dillon Engineering Services installs, tests and maintains electrical and instrumentation systems for process plants across Singapore. We finish the way a plant needs us to finish — with every loop checked and the certificates in your hand.

Dillon engineer in high-visibility clothing and hard hat on a plant work front
On the work front
Disciplines
Instrumentation · Electrical
Area
Jurong Island · Tuas · Mainland
Hazardous area
IEC 60079 · Zone 1 / Zone 2
Established
21 OCT 2000
E&IWhat we do

A plant does not care how the cable was pulled. It cares whether the loop reads true at 08:00 on start-up.

We are a process electrical and instrumentation contractor. That means field devices, hook-ups, tray and cable, terminations, calibration and the testing that proves all of it works together before anyone puts feed into the unit.

Most of our work sits alongside a main contractor on a live or turning-around plant, where the constraint is rarely the labour — it is the permit, the isolation, and the sequence. We plan for that, and we document as we go so that handover is a formality rather than a fight.

MethodHow a job runs

Six steps, in this order, every time.

Each one gates the next. Skipping ahead is how punch lists grow, so we don't.

  1. 1

    Drawings and scope review

    We work from your loop drawings, hook-up standards, cable schedules and area classification drawings. Discrepancies are raised as technical queries before material is ordered, not after it is on site.

  2. 2

    Material take-off and staging

    Take-off against the issued-for-construction drawings, then verification that glands, fittings and enclosures match the Ex protection concept for each area before anything is staged to the field.

  3. 3

    Installation

    Supports, tray and tubing first, then equipment, then cable. Work is released against permits and progressed on a plan that respects the mechanical and civil sequence rather than fighting it.

  4. 4

    Termination

    Field junction boxes, marshalling and system cabinets terminated to the wiring schedule, with continuity, insulation and polarity confirmed before any circuit is energised.

  5. 5

    Loop check and test

    Every loop proven end to end, from the field device to the control system graphic. Trips and alarms are verified at setpoint and the results signed into the loop folder.

  6. 6

    Punch clearance and handover

    Punch items tracked to closure, as-built drawings marked up, and the certificate and loop folder set handed over complete. The job is finished when the documentation is finished.

HSESafety and quality
Site crew reviewing the day's work in high-visibility clothing
Toolbox meeting

The permit comes first. Everything else waits.

Nobody on our crew starts work without a permit in hand, a briefing on the isolation boundary, and a gas test result they have seen for themselves.

Safety on a process plant is not a poster — it is a sequence of checks that either happened or did not. We work to the client's permit-to-work system, hold a toolbox meeting at the start of every shift, and stop when conditions change rather than pushing on to hold a schedule.

How we work safely

RefSelected work

Work we have delivered

All projects
INST

PetrochemicalJurong Island

Instrument installation and loop checking for a process unit tie-in

Field instrument installation, impulse line and hook-up work, junction box termination and full loop checking through to punch clearance, executed alongside the main mechanical contractor within a fixed tie-in window.

Loops checked
840
Duration
11 wk
Area classification
Zone 1
ELEC

Specialty chemicalsTuas

MCC replacement and cable termination for a production block

Removal of the existing motor control centre, installation and alignment of the replacement lineup, cable pulling and re-termination of motor and control circuits, insulation testing and phased re-energisation across a staged plant outage.

Motor circuits
62
Cable installed
9.4 km
Outage phases
3
QA-QC

PharmaceuticalTuas Biomedical Park

Clean utility instrumentation and calibration package

Installation of sanitary-service instrumentation on clean utility skids, orbital-compatible tubing support, calibration against traceable standards and documentation prepared to suit the client validation protocols.

Instruments
310
Certificates traceable
100%
Documentation set
IQ/OQ
ScopeSectors served

Where we work

Most of what we do sits inside a fence line on Jurong Island or in the Tuas industrial estates, on plants that run continuously and cannot be taken down casually.

Technician taking a reading from a field instrument
Field calibration
  • Petrochemical and refining
  • Specialty and fine chemicals
  • Oil and gas storage terminals
  • Pharmaceutical and biomedical
  • Power generation and utilities
  • Water and wastewater treatment
  • Food and beverage processing
  • Marine and offshore fabrication
26+
Years in operation
4
E&I disciplines in-house
Zone 1
Hazardous area capability
24/7
Shutdown and breakdown cover